PIV - Installation of Heating-insulating Wall System and Exterior Sun Shading Panel
   
  As a main project of Ecobuild, Pujiang Intelligence Valley has recently completed construction of the main works, and is now entering the phase of installing Heating-insulating Wall System and Exterior Sun Shading Panel. The project of PIV will be completed and presented to public in November through Ecobuild.
   
  PIV was awarded as “Innovative Energy Saving Construction” by Ministry of Construction, the construction of PIV are using the matured comprehensive design system. Six energy saving system are as following:
   
  Heating-insulating Wall System
The exterior wall uses outer heating insulating method. Firstly, this heating-insulating method does not occupy much indoor spaces; secondly, in comparison to the usual inner heat-insulating method, it works better in heat-insulation. It can protect the wall from the unfavorable air temperature outsides, to keep indoors comfortable, that is to say, no heat escape in winter and no heat seeping into indoors in the summer.
   
  Exterior Sun Shading Panel
The outer sun shading system uses aluminum alloy roller shutters. This kind of roller shutters has good wind-resistance and dust-resistance. Through this system people can do regulation according to the different requirements of solar radiation of indoor, in order to realize the self selection of light and heat.
   
  100% Fresh Air System
100% fresh air system uses large-scale professional fresh air unit to send the fresh air to every place in the way of low-speed ground plenum after through a set of dealing processes such as filtration and dusting, heating or cooling, damping, dehumidification etc.
   
  Floor Pipe System
Through the heat radiation produced by controlling the floor’s temperature, the floor pipe system can control the indoor air temperature. There are different requirements of the air temperature in the pipes in the winter and summer, warm water infused in the pipes in the winter, cool water infused in the summer. Because of the large size of the floor, the radiation of heating or cooling can keep the indoor temperature in the range of higher than 20°C in the winter and lower than 26°C in the summer, which is best for the human body.
   
  Geothermal Utilization System
The heat load of this project will be totally afforded by the effective and energy saving geothermal heat pump system. Geothermal heat pump supplies the building with heat and cooling through the underground energy. It is like a soil heat exchange; if heating, draw off heat from the soil; if cooling, release heat to the soil.
   
  Drainage System
PIV aims to reduce the usage of pipe water through a systematic design of drainage system. Adopting the drainage system will not only help preserve the water resource, but also cut down the cost of pipe water and sewage disposal.
   